Government RFPs & Bids for Construction of Structure and Facilities in Massachusetts State | MA
Bid Results:
557 bids(s) published in the last 90 days, of which 157 are currently open
Award Results:
39 government contract award(s)
Start a New Search
Sorted by
State
Massachusetts bids and contracts
|
Construction of Structure and Facilities
|
|
Bid / RFP Title
|
Due By
|
|
the scope includes the removal and replacement of an existing 4,900 sf membrane roof system
|
03/24/2010 |
|
ada upgrades to community building at doolan apartments, 667-2
|
03/25/2010 |
|
labor services to install 500 toilets for massachusetts public housing authorities located in gardner, fitchburg, leominster, lunenburg and sterling
|
03/25/2010 |
|
provide labor and materials to remove the asbestos insulation from the fittings on the existing steam supply and condensate return piping located in the crawl spaces of the muraco elementary school
|
03/24/2010 |
|
provide project management services for the design and construction/renovation of a school building
|
04/02/2010 |
|
replacement and upgrade of gas furnaces and boilers with new high efficiency equipment
|
04/08/2010 |
|
contractor roof replacement project
|
04/07/2010 |
|
chilled water system metering, west cambridge youth and vfw facility
|
03/25/2010 |
|
hazardous materials abatement, 161-181 main st.
|
03/24/2010 |
|
maintenance of burners for the worcester public schools, as-needed contract
|
03/24/2010 |
|
hemenway elderly housing, 660 washington st., canton: selective removal and reconstruction of wood framed balconies and stairs and related work
|
04/22/2010 |
|
procurement and installation of a solar photovoltaic system on the roof of mashpee town hall and the mashpee senior center
|
04/02/2010 |
|
stockbridge hall life safety upgrades
|
04/07/2010 |
|
renovations to st. patrick's school connecting modular classrooms
|
03/24/2010 |
|
removal of the existing wood siding and trim, installation of a new drainage plain and vapor retarder
|
03/25/2010 |
|
bearse's way reconstruction, phase ii
|
03/24/2010 |
|
handicap access improvement at various locations
|
04/01/2010 |
|
southwick dpw garage renovations
|
03/26/2010 |
|
repair and replacement of select cement panels, replacement of all sealant at the building's exterior and the replacement of the metal flashing at the perimeter of the main roof
|
04/01/2010 |
|
physical access improvements at garden city towers senior housing
|
04/14/2010 |